This video will show you the completed process of installing an EA500H6 rental LED video wall. Firstly, we should assemble the LED power box.
LED power box installation steps:
- Install the testing key, signal socket, power socket
- Install the power supply and fixed it with screws
- Connect the cables to the power supply
- Install the signal line
- Connect the signal line and testing line to the received card
- Assemble the received card in the power box
LED cabinet installation steps:
- Install the LED module slot to the LED cabinet frame
- Install rotating handle on the LED module
- Assemble the LED module to the LED cabinet frame
- Place the power box in the corresponding position and snap on the buckle
- Finish the installation and do a 72-hour testing
At the end of the video, you can see the finished rental LED display that features an excellent viewing experience. If you still have questions about this installation, our product engineer can provide a professional guidance.
Related Posts
Fill In Your Needs In Detail
Fill in the screen usage scene and size you need in “Content”.You will get a quote.