To help our customers understand and use our product, we created a video that explains how to install and hang the rental LED display. This video will provide clear instructions on how to hang and install LED displays.
The video shows the installation of the rental LED display in detail:
- Fix the fibre optic tape to the lifting beam using hooks
- Fix the lifting bar to the lifting holes using bolts
- Install all fibre optic straps, suspenders and other accessories according to these steps
- Attach the EA500C3 LED rental display to the boom using the two quick-locks on the top
- Connect two LED displays by using the quick lock on the left and right
- Connect the two panels to the boom with iron pieces
- Install the first row of cabinets following the steps above
- Connect the second row of the LED display through the quick-locks on the left, right, top and bottom
- Connect the four adjacent panels using iron pieces
- Connect all LED displays to power cables and signal cables
- After the installation, turn on the LED rental screen to test it
We recommend that customers perform a power on test after the installation to verify that all LED displays work properly. Meanwhile, we provide customers with detailed instructions and precautions throughout the installation process to ensure a successful installation and commissioning.
Related Posts
Fill In Your Needs In Detail
Fill in the screen usage scene and size you need in “Content”.You will get a quote.